Strait of Messina bridge open by 2035?
3
Ṁ1952035
41%
chance
1D
1W
1M
ALL
The bridge must be open to public traffic in both directions before the end of 2034.
Get Ṁ1,000 play money
Related questions
Related questions
Will a bridge across the Strait of Messina between mainland Italy and Sicily have started construction by 2030?
48% chance
Will Sicily be connected with the mainland by a bridge before 2038?
57% chance
Will there be a bridge open to traffic between Sicily and Italy at the end of 2029?
16% chance
Bridge built connecting mainland Italy to Sicily through 2030
16% chance
New SF Bay bridge any time through 2030
24% chance
Bridge built across the Strait of Gibraltar connecting Europe to Africa through 2040
11% chance
Will a crossing of the Strait of Gibraltar, between Morocco and Spain, have started construction by 2035?
33% chance
Will the Fehmarn Belt Tunnel open in 2029 or before?
33% chance
Which of these proposed crossings (bridge, tunnel or a combination) will be open by the end of 2050?
Will Saudi–Egypt Causeway be open to public by 2040?
64% chance